When a new analyzer goes in, the difference between trustworthy readings and chronic problems is decided long before the first calibration. TriNova installs analyzers, sample systems, transmitters, and field wiring to manufacturer specification — then verifies performance against your live readings, SCADA/DCS trends, and on-site lab data before handoff.
Our certified technicians install analyzers, sensors, transmitters, sample conditioning systems, and the field wiring that ties them into your control system. Every install is executed against manufacturer specifications, system design documents, and the site requirements that govern your facility — environmental, electrical, sample-handling, and signal-integrity considerations included.
Installation doesn't end at power-up. Post-installation, we monitor the analyzer's performance in place — verifying live readings, comparing against your SCADA/DCS trends, and performing grab-sample comparisons with the on-site lab where required. What turns over to operations is a system installed correctly, integrated cleanly, and confirmed performing against real process data.
How do you confirm the analyzer is performing correctly after installation? Post-installation, our technicians verify the analyzer against real process data, comparing live readings to your SCADA/DCS trends and performing grab-sample cross-checks with your on-site lab where required. Installation doesn't close until the analyzer is confirmed performing against actual process conditions, not just powered up and passing a factory checklist.
Do you handle the sample conditioning system as well, or just the analyzer? Both. We install and tube the full sample conditioning system — filters, regulators, coolers, fast loops, and disposal — alongside the analyzer itself. A properly installed analyzer on a bad sample system still gives bad readings, so we take ownership of the entire signal path.
What's included in the handoff at the end of installation? A complete as-built package: wiring diagrams, configuration settings, sample system schematics, loop check results, post-installation verification data, and any commissioning prerequisites your team or our commissioning crew needs to take the system live. Maintenance and compliance both start from this record.