A new compressed air system that "looks right" on the wiring diagram isn't the same as one that performs in production. Compressed air startup and commissioning from TriNova verifies every connection, configuration, and performance metric before handoff, so you transition to operations with confidence — not surprises.
TriNova technicians arrive after equipment is installed and ready for first energization. We verify electrical and mechanical connections, confirm control system parameters, and walk through manufacturer-recommended startup procedures step by step. The goal isn't just to turn the equipment on — it's to confirm every component performs as designed under real operating conditions before your team relies on it.
Once initial startup is complete, we move into commissioning — testing the system under varied load and process conditions, monitoring behavior, making fine adjustments, and documenting performance against design intent. By the time we hand off, you have a system that's been operationally validated, with the documentation to prove it.
Is commissioning separate from installation? Yes — installation is the physical work of putting equipment in place; commissioning is the verification and configuration work that follows. Some customers bundle both with our Turnkey Installation service for a single point of accountability. Others handle installation separately and bring us in for commissioning only.
What does the commissioning deliverable look like? A formal commissioning report documenting verification of each connection and configuration, results of operational testing, performance data against design specifications, and any deviations or corrections made during the process. The report supports warranty claims, internal capital project closeout, and your long-term asset records.
How long does commissioning take? It depends on system complexity. A single compressor installation may commission in a day or two. A multi-compressor system with integrated dryers, treatment, and controls typically runs three to five days. We provide a detailed schedule before mobilizing so you can coordinate with production planning.