Are your fire & gas devices tested, documented, and ready to respond when needed? TriNova performs manufacturer-agnostic fire & gas audits across your existing installed base — verifying device condition, calibration status, alarm response, and controller logic before an incident, outage, or audit exposes a problem.
Our specialists perform a structured field review of the equipment installed at your facility today — point gas detectors, flame detectors, line-of-sight and open-path devices, controllers, alarm and annunciation devices, and the wiring and interfaces that carry alarms into your control system. Device condition, aiming, calibration status, and documentation gaps are captured, and the response chain from device through controller to your PLC, DCS, SCADA, or HMI is confirmed end to end.
The result is a documented picture of current condition with a prioritized deficiency list and recommended next steps — repairs, calibration, controller work, training, a maintenance agreement, or targeted upgrades — sized to what your system actually needs.
Do you service equipment TriNova did not originally supply? Yes. Our audits are manufacturer-agnostic and cover the installed base as it exists today — including devices, controllers, and interfaces from other manufacturers. You don't need to replace the system to have it audited.
Does the audit verify alarm response, or just detector condition? Both. Device-level condition — detectors, warning devices, controllers — is one part of the audit. The other part is response verification: confirming that when a device detects, the alarm actually reaches the fire & gas controller, the connected PLC / DCS / SCADA / HMI, and the operator interface where the response is expected.
What do we receive at the end of the audit? A device-by-device audit report with pass/fail status, a prioritized deficiency list, calibration and condition observations, response-chain verification notes, and recommended next steps — built to support immediate corrective action, turnaround scope, and long-term reliability planning.