Need more maintenance support? — Learn More

TriNova logo

Fire & Gas Maintenance Contracts

Turn fire & gas maintenance into a planned program instead of a reactive expense. TriNova's maintenance contracts deliver scheduled inspection, bump testing, span calibration where required, and controller response verification — manufacturer-agnostic and documented for compliance, insurance, and readiness reviews.

How TriNova manages a Fire & Gas Maintenance Contract

We build the program around your installed base — point gas detectors, flame detectors, LOS/open-path devices, fire & gas controllers, warning devices, and the interfaces into your control system. Cadence is set to fit your operation (annual, semi-annual, quarterly, or outage-based) and scope can be tiered from a basic readiness check (visual inspection, device status, bump test, alarm response) to a calibrated system PM (bump test plus span calibration) to full system verification (device testing plus controller loop logic and control system response confirmation).

Each visit produces a device-by-device record — findings, corrective actions, and calibration data — that builds the compliance and readiness history your safety, insurance, and regulatory reviews depend on.

Request Service

  • Scheduled inspection of gas detectors, flame detectors, open-path devices, controllers, and warning devices
  • Bump testing and functional response confirmation on a defined cadence
  • Span calibration of applicable gas detectors where required
  • Fire & gas controller checks and loop response verification into your PLC, DCS, SCADA, or HMI
  • Deficiency documentation and prioritized corrective action recommendations
  • Full visit-by-visit records for compliance, readiness reviews, and reliability programs

The Outcome

What a Fire & Gas Maintenance Contract delivers

Response verified on every visit

Every scheduled service confirms devices detect and alarms reach the right system — not just that the device shows a green light. The response chain from field device through controller to control system is verified and documented, every time.

Deficiencies caught between failure events

Scheduled visits surface degraded devices, wiring issues, drift, misalignment, and controller-side faults before they show up as a missed detection, a nuisance alarm cluster, or a failed inspection. Small problems get caught small.

Predictable maintenance costs

Budget for scheduled fire & gas care instead of absorbing emergency callouts. Contract pricing replaces the rotating surprise of unplanned repair visits with a number you can plan around.

A documented compliance and readiness history

Every visit produces a record — pass/fail by device, response verification, calibration data, deficiency findings, and corrective action notes — building the audit-ready history your safety, insurance, and regulatory reviews all depend on.

When to start a maintenance contract

Common reasons facilities sign a Fire & Gas Maintenance Contract

  • Replacing reactive service with a scheduled, predictable preventative maintenance program
  • Reducing nuisance alarms, repeat callouts, and unplanned process disruption
  • Building a documented compliance and readiness history for safety, insurance, or regulatory review
  • Aligning fire & gas service to outage or turnaround windows on a recurring schedule
  • Freeing internal maintenance and safety teams to focus on higher-value work

Fire & Gas Maintenance Contract FAQs

What is included in a preventive maintenance contract? Scheduled inspection, bump testing, span calibration of applicable gas detectors, fire & gas controller checks, response verification into your PLC / DCS / SCADA / HMI, deficiency documentation, and corrective action recommendations. Scope is tiered to what your installed base needs — from a basic readiness check to full system verification with loop logic testing.

Can maintenance be scheduled around outages or turnarounds? Yes. Cadence can be built around annual, semi-annual, quarterly intervals, outage/turnaround windows, or a combination. Contract customers get priority scheduling for outage-window work so testing, calibration, and controller checks land in the window when access is available.

Do you provide service records? Every visit closes with a device-by-device record — pass/fail status, bump test and calibration data, response verification notes, deficiencies found, and corrective actions. Records build the compliance and readiness history your safety, insurance, and regulatory reviews depend on.

Request a Quote

Fill out the form below and we’ll get back to you as soon as possible.