Does your newly installed fire & gas system work as designed before you depend on it? TriNova's commissioning verifies installation, configuration, bump/span testing, loop checks, alarm response, and interfaces to your control system — every device, every loop, documented for turnover.
Our specialists work through a structured commissioning sequence — installation verification, device configuration, bump testing and span calibration where required, loop checks, alarm response confirmation, customer controls interface verification, and fire & gas controller function testing. Alarm response is confirmed end to end, from field device through the controller and into your PLC, DCS, SCADA, or HMI.
The result is a fire & gas system verified device by device, loop by loop, with the response chain proven and the record built to satisfy final acceptance, warranty documentation, and future audit review.
Do you test the full loop logic, or just the individual devices? Both. Device-level testing verifies each detector, warning device, and controller point works. Loop-logic testing verifies that when the device detects, the right response fires — alarm, relay, output, inhibit or bypass status, latching, reset, time delays, and communication into the control system all behave as the cause-and-effect design specifies. Fire & gas systems fail when a device works but the response doesn't, so both layers get tested.
What if a device or loop doesn't pass commissioning? We document what's failing, identify the root cause, and provide a corrective action plan before signing off. Depending on the issue, we resolve it on the spot, coordinate with the installation contractor, or escalate to the source manufacturer. The point of commissioning is to catch these issues before operations depends on the system — so finding something is a feature, not a failure.
What documentation do we receive at the end? A complete commissioning package — installation verification, device configuration snapshots, functional test results, loop-logic verification notes with pass/fail by loop, end-to-end response records, and a signed commissioning report. Structured to support your project closeout, final acceptance testing, warranty registration, and operations handoff.