When your heat trace system has to perform, and you have to know it will, before the first cold front commissioning is what turns an installed system into a verified one. TriNova verifies electrical connections, controller configuration, heat trace circuits, and temperature control performance before your system ever has to defend against a freeze event.
Before your newly installed heat trace system goes live, TriNova technicians verify electrical connections, confirm controller configuration, test heat trace circuits, and validate temperature control performance. The team performs operational testing and makes any necessary adjustments to ensure the system operates according to design requirements and is fully functional before being placed into service.
The result is a heat trace system that's commissioned, calibrated, and documented reducing the risk of system failures during critical operating conditions and giving you confidence the system will maintain required temperatures reliably when it matters.
How is this different from installation? Installation puts the heat trace cable, controllers, and connections in place. Commissioning proves the system works — and works reliably under operating conditions. The two are often performed back-to-back by the same team, but commissioning is the verification step — electrical, controller, circuit, and temperature performance testing — that turns an installed system into one your operations team can rely on through the winter.
What if the system doesn't pass commissioning? We document what's failing, identify the root cause, and provide a corrective action plan before signing off. Depending on the issue, we resolve it on the spot, coordinate with the installation contractor, or escalate to the manufacturer. The point of commissioning is to catch these issues before operations starts depending on the heat trace — so finding something is a feature, not a failure.
What documentation do we receive at the end? A complete commissioning package — electrical connection verification, controller configuration snapshot, heat trace circuit test results, temperature control validation, operational test records, and a signed commissioning report. Built to support your project closeout, your operations handoff, and your FERC winterization compliance documentation.